-
Date
15/05/2018
-
Category
Logements collectifs
-
Place
Huy, Belgium
It was during a major renovation of a bloc of the hospital that the solar thermal project was born.
The client, motivated by the integration of renewable energies in the energy mix, opted to cover the entire roof of the building with a little less than 300 square meters of solar thermal collectors Sunoptimo. This yied of collectors feeds the hospital with green heat for approximately 30% of its total needs. A real success for Sunoptimo that confirms its commitment and mastery of drainback for large solar thermal systems.